Contact system to
connect choke to the Circuit
|
The
Company
We are automation people, in the field of mass production of
lighting gear manufacturing, since 1985.
Our SPMs are ergonomically designed, energy efficient & well
known for quality as well as performance.
Deskilling, elimination of human error, reduction of operator
fatigue & reduction in cycle time of operation are achieved
by introduction of our SPMs. |
|
Module
1
Automatic
testing of 5 different parameters are made possible by the 6
station indexing table. Every station has its own Toggle
Clamps, Contact assembly, Earthing plate, Brass slip rings and
brushes. Stationery brushes are connected to the measuring
circuit. While unloading and loading of choke are manual;
clamping, indexing & de-clamping are automatic. |

6 Station
Indexing Table Dial
|
|

Micro Pneumatic
Sequencing Circuit
|

The auto-manual
controls
|
|

Electrical
Measuring & Integrating Circuit
|
| Module
2
Best
known digital meters are used with band compotator, Upper &
Lower limits of 5 parameters are set in these meters. If
measured outside the band the choke will be rejected.
Indexing will stop until the operator marks the rejected choke
& gives a signal to continue indexing. |

|
|
Convenience
Once
tooled up, change over from one type of choke to another will
take only 15 to 20 minutes, including entering the new parameter
limits on the digital meters.
|
Options
By
passing any of the 5 parameters tested is also possible by
selection.
Cycle time can also be altered according to the skill of the
operator & the difficulty factor of handling the chokes. |